ABOUT THE PROJECT
The renovation of around 10,800 square meters of internal floor area began in May 2010 and was completed by December 2011. The project required the installation of 9 staircases, 6 atrium void areas, 2 mezzanine levels, and 1 external balcony area. Installer P&W Site Fixing selected railing products for this important project. The requirement included handrails, baluster brackets, wall flanges, triangular base covers, and adjustable connectors. The Droylsden Academy students now benefit from attractively decorated and inspiring spaces. Design in support of learning!